Infrastructure Specific Information
| Entry Spec |
The Wytch Farm Gathering Station was designed specifically for Wareham and Wytch Farm crude oil processing. GOR of these crudes range from 12 -360 scf/bbl and are traditionally low in hydrogen sulphide H2S by exploration standards.
Maximum inlet conditions - 10 barg & 700C |
| Exit Spec |
Crude Oil Propane Butane Sales Gas |
| Details of Primary separation processing facilities | The Wytch Farm Gathering Station was designed as a single train oil and gas processing unit, and processed in excess of 110mbd on plateau at a GOR of 360 scf/bbl. |
| Details of Gas treatment facilities | Single train gas processing with gas dehydration and zinc oxide beds for removal of trace H2S. Sales gas & propane product streams as well as fuel gas for use on site. Butane manufacture ending during 2010. |
