| Location |
Northern North Sea, 270 km ENE of Aberdeen |
| Block number |
Straddles two blocks, 16/7b and 16/8b, licensed to BP and ConocoPhillips respectively |
| Water depth |
100 metres |
| Size of field |
Large - 335 million barrels and 505 bcf recoverable (1999) |
| Number of platforms |
1 |
| Oil export pipeline |
18 - inch to Brae, then to Forties Pipeline System |
| Gas export pipeline |
30-inch to St Fergus, then to Peterhead Power Station |
| Peak |
150,000 bpd in 1995/6 |
| Participants |
BP 52%, ConocoPhillips 30%, Enterprise 18% |
| Development Costs |
1.3 billion pounds |